Onshore wind · United Kingdom

Timet UK

Operator Timet UK

Application Refused2 MWData checked 16 November 2026Source record dated 27 July 2005

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Timet UK is a 2 MW wind farm 3.9 km south of Gorseinon, West Glamorgan, United Kingdom. Its planning application (2003/1860) went to Swansea on 15 September 2003 and was refused on 16 August 2004. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 60 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

213 energy sites within 40 km for Timet UK

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Timet UK
Location
Warnarlwydd,Swansea, West Glamorgan, United Kingdom
Planning authority
Swansea
Planning application
2003/1860

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2003/1860, with what the planning evidence pack adds for this site.

Every application in Swansea · Alerts for applications and incidents near here

  • 15 September 2003 Planning application submitted
  • 16 August 2004 Planning permission refused

None found. The register holds no published incident that names Timet UK. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Timet UK had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Timet UK; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Timet UK?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 July 2005.
Where is Timet UK?
3.9 km south of Gorseinon, West Glamorgan, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).