← Back to Hampshire

Solar · United Kingdom

Three Maids Hill Solar Farm

Operator Environmenta Asset Management

Operational25 MWData checked 16 November 2026Source record dated 23 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Three Maids Hill Solar Farm is a 25 MW solar farm 5.7 km north of Winchester, Hampshire, United Kingdom. Its planning application (20/02311/FUL) went to Winchester on 21 October 2020 and was granted on 19 May 2021. It has been operating since 1 January 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

398 energy sites within 40 km for Three Maids Hill Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Environmenta Asset Management
Location
Water Tower Christmas Hil, Three Maids Hill, South Wonston, Winchester, Hampshire, SO21 2QG, United Kingdom
Planning authority
Winchester
Planning application
20/02311/FUL
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/02311/FUL, with what the planning evidence pack adds for this site.

Every application in Winchester · Alerts for applications and incidents near here

  • 21 October 2020 Planning application submitted
  • 19 May 2021 Planning permission granted
  • 1 January 2023 Operational

None found. The register holds no published incident that names Three Maids Hill Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Three Maids Hill Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Three Maids Hill Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Three Maids Hill Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 January 2024.
Where is Three Maids Hill Solar Farm?
5.7 km north of Winchester, Hampshire, United Kingdom (postcode SO21 2QG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).