Solar · United Kingdom
The Hayloft - Solar panels
Operator All In One Services
Awaiting ConstructionData checked 16 November 2026Source record dated 3 June 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
The Hayloft - Solar panels is a solar farm 19 km east of Ilfracombe, Devon, United Kingdom. Its planning application (62/41/21/005) went to North Devon on 21 January 2021 and was granted on 21 April 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when The Hayloft - Solar panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Hayloft - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 56 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 56 km | Significant |
| EIR-1486 | 2026 | Fire under solar panels at Broadclyst brought under control | 59 km | Significant |
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 59 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- All In One Services
- Location
- The Hayloft, Bakers Court, Bakers Court Lane, Lynton, Devon, EX35 6EW, United Kingdom
- Planning authority
- North Devon
- Planning application
- 62/41/21/005
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 62/41/21/005, with what the planning evidence pack adds for this site.
Every application in North Devon · Alerts for applications and incidents near here
Timeline
- 21 January 2021 Planning application submitted
- 21 April 2021 Planning permission granted
- 21 April 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names The Hayloft - Solar panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has The Hayloft - Solar panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names The Hayloft - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of The Hayloft - Solar panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2021.
- Where is The Hayloft - Solar panels?
- 19 km east of Ilfracombe, Devon, United Kingdom (postcode EX35 6EW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).