← Back to Hampshire
Planning pack for this site, £295Other options

Solar · United Kingdom

The Costello School - Solar PV Array

Operator Nero Energy

Awaiting ConstructionData checked 16 November 2026Source record dated 10 November 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Costello School - Solar PV Array is a solar farm in Basingstoke, Hampshire, United Kingdom. Its planning application (25/01635/FUL) went to Basingstoke and Deane on 16 July 2025 and was granted on 27 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Costello School - Solar PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 2.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing2.5 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet17 kmSignificant
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats38 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Nero Energy
Location
The Costello School, Crossborough Hill, Basingstoke, Hampshire, RG21 4AL, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
25/01635/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01635/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 16 July 2025 Planning application submitted
  • 27 October 2025 Planning permission granted

None found. The register holds no published incident that names The Costello School - Solar PV Array. If you know of one, report it (confidential reports are anonymised).

Has The Costello School - Solar PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Costello School - Solar PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Costello School - Solar PV Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 November 2025.
Where is The Costello School - Solar PV Array?
In Basingstoke, Hampshire, United Kingdom (postcode RG21 4AL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).