Teviot Wind Farm

Operator Muirhall Energy Limited

Application Withdrawn34 MWData checked 16 November 2026Source record dated 5 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Teviot Wind Farm is a 34 MW solar farm 13 km south-west of Hawick, Borders, United Kingdom. Its planning application (ECU00003249) went to Scottish Government (S36) on 20 May 2022 and was withdrawn on 6 July 2026. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 5 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 10 other sites and 94 energy sites within 40 km for Teviot Wind Farm

Members see the sites and incidents around this one, and every record behind them.

MUIRHALL ENERGY LIMITED (SC355143), active, since 2009. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar (Co-located with RE)
Capacity
34 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Muirhall Energy Limited
Location
Teviot Wind Farm Land South, East And West Of Priesthaugh, Borders, TD9, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003249

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003249, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

Status changed from Application Submitted to Application Withdrawn on 16 November 2026.

  • 20 May 2022 Planning application submitted
  • 6 July 2026 Application withdrawn

None found. The register holds no published incident that names Teviot Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Teviot Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Teviot Wind Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Teviot Wind Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Teviot Wind Farm?
13 km south-west of Hawick, Borders, United Kingdom (postcode TD9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).