Solar · United Kingdom
Teviot Wind Farm
Operator Muirhall Energy Limited
Application Withdrawn34 MWData checked 16 November 2026Source record dated 5 October 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Teviot Wind Farm is a 34 MW solar farm 13 km south-west of Hawick, Borders, United Kingdom. Its planning application (ECU00003249) went to Scottish Government (S36) on 20 May 2022 and was withdrawn on 6 July 2026. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 5 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Teviot Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
MUIRHALL ENERGY LIMITED (SC355143), active, since 2009. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar (Co-located with RE)
- Capacity
- 34 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Muirhall Energy Limited
- Location
- Teviot Wind Farm Land South, East And West Of Priesthaugh, Borders, TD9, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00003249
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00003249, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Status changed from Application Submitted to Application Withdrawn on 16 November 2026.
Timeline
- 20 May 2022 Planning application submitted
- 6 July 2026 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Teviot Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Teviot Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Teviot Wind Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Teviot Wind Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Teviot Wind Farm?
- 13 km south-west of Hawick, Borders, United Kingdom (postcode TD9).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).