Planning pack for this site, £295Other options

Solar · United Kingdom

Tamworth Logistics Park, Dordon - Solar Panels

Operator Indurent Management Limited

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 7 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tamworth Logistics Park, Dordon - Solar Panels is a 0.5 MW solar farm on the edge of Polesworth, Staffordshire, United Kingdom. Its planning application (PAP/2026/0042) went to North Warwickshire on 23 January 2026 and was granted on 23 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INDURENT MANAGEMENT LIMITED (02120839), active, since 1987. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tamworth Logistics Park, Dordon - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college20 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge40 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property48 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Indurent Management Limited
Location
Unit 5, Tamworth Logistics Park, Signet Way, Dordon, Tamworth, Staffordshire, B78 2FG, United Kingdom
Planning authority
North Warwickshire
Planning application
PAP/2026/0042

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PAP/2026/0042, with what the planning evidence pack adds for this site.

Every application in North Warwickshire · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 23 January 2026 Planning application submitted
  • 23 April 2026 Planning permission granted

None found. The register holds no published incident that names Tamworth Logistics Park, Dordon - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Tamworth Logistics Park, Dordon - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tamworth Logistics Park, Dordon - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tamworth Logistics Park, Dordon - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Tamworth Logistics Park, Dordon - Solar Panels?
On the edge of Polesworth, Staffordshire, United Kingdom (postcode B78 2FG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).