Planning pack for this site, £295Other options

Solar · United Kingdom

Hornhill Road, Nunnery Way - Solar Panels

Operator Indurent Management Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 12 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hornhill Road, Nunnery Way - Solar Panels is a 0.2 MW solar farm 3.3 km east of Worcester, United Kingdom. Its planning application (26/00240/GPJ) went to Worcester on 12 March 2026 and was granted on 10 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INDURENT MANAGEMENT LIMITED (02120839), active, since 1987. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hornhill Road, Nunnery Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home11 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college39 kmMinor
EIR-15512019Fire involving solar panels on a garage roof in Shropshire42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Indurent Management Limited
Location
Unit 10 -12, Hornhill Road, Nunnery Way, Worcester, Worcestershire, WR4 0SX, United Kingdom
Planning authority
Worcester
Planning application
26/00240/GPJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00240/GPJ, with what the planning evidence pack adds for this site.

Every application in Worcester · Alerts for applications and incidents near here

  • 12 March 2026 Planning application submitted
  • 10 April 2026 Planning permission granted

None found. The register holds no published incident that names Hornhill Road, Nunnery Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Hornhill Road, Nunnery Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hornhill Road, Nunnery Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hornhill Road, Nunnery Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
Where is Hornhill Road, Nunnery Way - Solar Panels?
3.3 km east of Worcester, United Kingdom (postcode WR4 0SX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).