← Back to Lincolnshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Swinderby Quarry - Solar PV Array

Operator CEMEX UK Properties

Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 3 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Swinderby Quarry - Solar PV Array is a 1.2 MW solar farm 10 km south-west of Bracebridge Heath, Lincolnshire, United Kingdom. Its planning application (PL/0055/23) went to North Kesteven on 8 August 2023 and was granted on 13 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Swinderby Quarry - Solar PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine30 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby35 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster43 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
CEMEX UK Properties
Location
Swinderby Quarry, Witham St Hughes, Lincoln, Lincolnshire, LN6 9TW, United Kingdom
Planning authority
North Kesteven
Planning application
PL/0055/23

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/0055/23, with what the planning evidence pack adds for this site.

Every application in North Kesteven · Alerts for applications and incidents near here

  • 8 August 2023 Planning application submitted
  • 13 November 2023 Planning permission granted
  • 13 November 2026 Planning permission expired

None found. The register holds no published incident that names Swinderby Quarry - Solar PV Array. If you know of one, report it (confidential reports are anonymised).

Has Swinderby Quarry - Solar PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Swinderby Quarry - Solar PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Swinderby Quarry - Solar PV Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2025.
Where is Swinderby Quarry - Solar PV Array?
10 km south-west of Bracebridge Heath, Lincolnshire, United Kingdom (postcode LN6 9TW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).