Around this site

← Back to Pernambuco

Solar · Brazil

Surubim Solar Project

Cancelled (shelved)600 MWChecked 8 October 2026Last changed in the dataset 20 November 2025

Technology
Solar
Capacity
600 MW
Status
Cancelled (shelved) (Shelved)
Operator
Quinturaré
Owner
Quinturaré [100%]
Location
Petrolândia, Região Geográfica Intermediária de Serra Talhada, Pernambuco, Brazil
Phases in the tracker
15

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Surubim Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.