← Back to California

Solar · United States

Summer Solar A2

Operator AES Distributed Energy

Operational1.5 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Summer Solar A2 is a 1.5 MW solar farm 11 km north-west of Quartz Hill, Los Angeles County, California, United States. It first operated in 2014. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 46 other energy sites within 10 km, 40 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 260 other sites and 230 energy sites within 40 km for Summer Solar A2

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.5 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
AES Distributed Energy
Owner
AES Distributed Energy
Location
Los Angeles County, California, United States
First operating
2014
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Summer Solar A2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Summer Solar A2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Summer Solar A2; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Summer Solar A2?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Summer Solar A2?
11 km north-west of Quartz Hill, Los Angeles County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).