Planning pack for this site, £295Other options

Solar · United Kingdom

Stirling Way, Bretton - Solar Panels

Operator Industrials Propco 1 Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 13 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stirling Way, Bretton - Solar Panels is a 0.3 MW solar farm 4.5 km north-west of Peterborough, Cambridgeshire, United Kingdom. Its planning application (24/01277/PRIOR) went to Peterborough on 8 October 2024 and was granted on 29 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stirling Way, Bretton - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 4.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof4.7 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering38 kmMinor
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine40 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Industrials Propco 1 Limited
Location
Coningsby Business Park, Stirling Way, Bretton, Peterborough, Cambridgeshire, PE3 8SB, United Kingdom
Planning authority
Peterborough
Planning application
24/01277/PRIOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01277/PRIOR, with what the planning evidence pack adds for this site.

Every application in Peterborough · Alerts for applications and incidents near here

  • 8 October 2024 Planning application submitted
  • 29 November 2024 Planning permission granted

None found. The register holds no published incident that names Stirling Way, Bretton - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Stirling Way, Bretton - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stirling Way, Bretton - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stirling Way, Bretton - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
Where is Stirling Way, Bretton - Solar Panels?
4.5 km north-west of Peterborough, Cambridgeshire, United Kingdom (postcode PE3 8SB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).