← Back to Nevada

Solar · United States

Stillwater Solar PV II

Operator Ormat Stillwater Solar PV II, LLC · Owner Enel Green Power NA, Inc.

Operational20 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stillwater Solar PV II is a 20 MW solar farm 20 km east of Fallon, Churchill County, Nevada, United States. It first operated in 2018. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

1 energy site within 40 km for Stillwater Solar PV II

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
20 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Ormat Stillwater Solar PV II, LLC
Owner
Enel Green Power NA, Inc.
Location
Churchill County, Nevada, United States
First operating
2018
Balancing authority
NEVP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Stillwater Solar PV II. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stillwater Solar PV II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stillwater Solar PV II; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Stillwater Solar PV II?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Stillwater Solar PV II?
20 km east of Fallon, Churchill County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).