Steward Creek Solar Phase 1

Operator TerraForm Power Operating, LLC

Planned1,200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Steward Creek Solar Phase 1 is a 1,200 MW solar farm 14 km south-east of Rochelle, Lee County, Illinois, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 4 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Steward Creek Solar Phase 1 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1169, Solar panel fire forces evacuation at IKEA Bolingbrook, 77 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11692018Solar panel fire forces evacuation at IKEA Bolingbrook77 kmMinor
EIR-22012021Melting snow slides off rooftop solar panels and damages cars80 kmMinor
EIR-11722025Fire damages roof and solar panels at Joliet IKEA warehouse82 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1,200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
TerraForm Power Operating, LLC
Owner
TerraForm Power Operating, LLC
Location
Lee County, Illinois, United States
Expected
2029
Balancing authority
PJM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Steward Creek Solar Phase 1. If you know of one, report it (confidential reports are anonymised).

Has Steward Creek Solar Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Steward Creek Solar Phase 1; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Steward Creek Solar Phase 1?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Steward Creek Solar Phase 1?
14 km south-east of Rochelle, Lee County, Illinois, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).