Operator Bürgerwind Niers-Maas GmbH & Co. KG

Planned14 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

StepII is a 14 MW wind farm 7.1 km south of Kevelaer, Geldern, Kleve, Nordrhein-Westfalen, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 29 other energy sites within 10 km, 24 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for StepII sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-2576, Wind turbine collapses onto fields in Weeze, Germany, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25762026Wind turbine collapses onto fields in Weeze, Germany12 kmMajor
EIR-18112023Wind turbine reported to have snapped and collapsed into a field in north-west Germany71 kmMajor
EIR-07992021Wind turbine collapses at Haltern AV9 wind park in Germany71 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
14 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Bürgerwind Niers-Maas GmbH & Co. KG
Location
Geldern, Kleve, Nordrhein-Westfalen, 47608, Germany
First operating
2027
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names StepII. If you know of one, report it (confidential reports are anonymised).

Has StepII had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names StepII; it holds 30 incidents at wind farms in Germany.
What is the status of StepII?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is StepII?
7.1 km south of Kevelaer, Geldern, Kleve, Nordrhein-Westfalen, Germany (postcode 47608).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).