← Back to Arkansas
Planning pack for this site, £295Other options

Solar · United States

Steel River Solar Phase 3

Operator Cypress Creek Renewables

Under construction500 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Steel River Solar Phase 3 is a 500 MW solar farm 18 km south-west of Osceola, Mississippi County, Arkansas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 6 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Steel River Solar Phase 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1934, Solar inverter fire at Sunflower Solar after an explosion call, 210 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19342022Solar inverter fire at Sunflower Solar after an explosion call210 kmMinor
EIR-04382025Solar inverter fire extinguished at solar farm near Robards, Kentucky326 kmMinor
EIR-12552025Field fire at solar farm north of Carmi contained to vegetation328 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
500 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Cypress Creek Renewables
Owner
Cypress Creek Renewables
Location
Mississippi County, Arkansas, United States
Expected
2030
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Steel River Solar Phase 3. If you know of one, report it (confidential reports are anonymised).

Has Steel River Solar Phase 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Steel River Solar Phase 3; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Steel River Solar Phase 3?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Steel River Solar Phase 3?
18 km south-west of Osceola, Mississippi County, Arkansas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).