Solar · United States
Steel River Solar Phase 1
Under construction500 MWChecked 6 October 2026
The site
- Technology
- Solar
- Capacity
- 500 MW
- Status
- Under construction
- Operator
- Cypress Creek Renewables
- Location
- Mississippi County, Arkansas, United States
- Expected
- 2028
- Balancing authority
- MISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Steel River Solar Phase 1. If you know of one, report it (confidential reports are anonymised).
Follow Steel River Solar Phase 1
Get one email when this site's status changes in the U.S. Energy Information Administration, Form EIA-860M, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at solar farms in the United States
The register holds 137 incidents at solar farms in the United States, 87 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.