Solar · United Kingdom
Stanstead Solar Project
Operator Manchester Airport Group Plc
Operational14.3 MWData checked 16 November 2026Source record dated 23 October 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Stanstead Solar Project is a 14.3 MW solar farm 4.7 km east of Stansted Mountfitchet, Essex, United Kingdom. Its planning application (S62A/22/0000004) went to Uttlesford on 1 June 2022 and was granted by the Secretary of State on 24 August 2022. It has been operating since 1 October 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Stanstead Solar Project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 14.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Manchester Airport Group Plc
- Location
- E/O Coopers End Road, Essex, CM22 6PL, United Kingdom
- Planning authority
- Uttlesford
- Planning application
- S62A/22/0000004
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for S62A/22/0000004, with what the planning evidence pack adds for this site.
Every application in Uttlesford · Alerts for applications and incidents near here
Status changed from Under Construction to Operational on 16 November 2026.
Timeline
- 1 June 2022 Planning application submitted
- 24 August 2022 Planning permission granted
- 24 August 2022 Granted by the Secretary of State
- 1 January 2025 Construction started
- 1 October 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Stanstead Solar Project. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Stanstead Solar Project had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Stanstead Solar Project; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Stanstead Solar Project?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Stanstead Solar Project?
- 4.7 km east of Stansted Mountfitchet, Essex, United Kingdom (postcode CM22 6PL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).