← Back to Tayside
Planning pack for this site, £295Other options

Solar · United Kingdom

Standingfauld Farm, Muthill - Solar Panels

Operator Relay Standingfauld Limited

Awaiting Construction14 MWData checked 16 November 2026Source record dated 1 February 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Standingfauld Farm, Muthill - Solar Panels is a 14 MW solar farm 7.5 km west of Auchterarder, Tayside, United Kingdom. Its planning application (22/01179/FLL) went to Perth and Kinross on 4 August 2022 and was granted on 8 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Standingfauld Farm, Muthill - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline34 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie72 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School117 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
14 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Relay Standingfauld Limited
Location
300 Metres SE/O Standingfauld Farm Muthill, Tayside, PH5 2BU, United Kingdom
Planning authority
Perth and Kinross
Planning application
22/01179/FLL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/01179/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 4 August 2022 Planning application submitted
  • 8 November 2022 Planning permission granted
  • 8 November 2025 Planning permission expired

None found. The register holds no published incident that names Standingfauld Farm, Muthill - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Standingfauld Farm, Muthill - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Standingfauld Farm, Muthill - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Standingfauld Farm, Muthill - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 February 2023.
Where is Standingfauld Farm, Muthill - Solar Panels?
7.5 km west of Auchterarder, Tayside, United Kingdom (postcode PH5 2BU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).