St Georges Cross Farm, Berkley Lane - Battery Energy Storage

Operator Integrum SPV 23101 Limited · Owner Enray Power LTD

Application Refused60 MWData checked 19 November 2026Source record dated 19 May 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

St Georges Cross Farm, Berkley Lane - Battery Energy Storage is a 60 MW battery storage site 3.5 km north-east of Frome, Somerset, United Kingdom. Its planning application (2025/0690/FUL) went to Somerset on 30 April 2025 and was refused on 17 April 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 30 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 415 energy sites within 40 km for St Georges Cross Farm, Berkley Lane - Battery Energy Storage

Members see the sites and incidents around this one, and every record behind them.

INTEGRUM SPV 23101 LIMITED (15567337), active, since 2024. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
60 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Integrum SPV 23101 Limited
Owner
Enray Power LTD
Location
St Georges Cross Farm, Berkley Lane, Berkley, Frome, Somerset, BA11 6TQ, United Kingdom
Planning authority
Somerset
Planning application
2025/0690/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2025/0690/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 30 April 2025 Planning application submitted
  • 17 April 2026 Planning permission refused

None found. The register holds no published incident that names St Georges Cross Farm, Berkley Lane - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has St Georges Cross Farm, Berkley Lane - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names St Georges Cross Farm, Berkley Lane - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of St Georges Cross Farm, Berkley Lane - Battery Energy Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2026.
Where is St Georges Cross Farm, Berkley Lane - Battery Energy Storage?
3.5 km north-east of Frome, Somerset, United Kingdom (postcode BA11 6TQ).