St Fergus Renewable Energy Park

Operator Ednie Farms

Under Construction3 MWData checked 16 November 2026Source record dated 1 February 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

St Fergus Renewable Energy Park is a 3 MW wind farm 7.5 km north-west of Peterhead, Grampian, United Kingdom. Its planning application (APP/2019/2653) went to Aberdeenshire on 3 December 2019 and was granted on appeal on 21 July 2021. Construction started on 6 February 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 21 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

EDNIE FARMS (SL004197), active, since 2001. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for St Fergus Renewable Energy Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 95 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire95 kmMinor
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth162 kmSignificant
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm162 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Ednie Farms
Location
Land Adjacent To The St Fergus, St. Fergus, Peterhead, Grampian, AB42 3BR, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2019/2653
Appeal reference
PPA-110-2407
Turbines
2, 119 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2019/2653, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 3 December 2019 Planning application submitted
  • 7 December 2020 Planning permission refused
  • 21 July 2021 Planning permission granted
  • 21 July 2021 Appeal granted
  • 6 February 2023 Construction started

None found. The register holds no published incident that names St Fergus Renewable Energy Park. If you know of one, report it (confidential reports are anonymised).

Has St Fergus Renewable Energy Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names St Fergus Renewable Energy Park; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of St Fergus Renewable Energy Park?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 February 2023.
Where is St Fergus Renewable Energy Park?
7.5 km north-west of Peterhead, Grampian, United Kingdom (postcode AB42 3BR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).