Planning pack for this site, £295Other options

Solar · United Kingdom

St Andrews Industrial Estate, Third Way - Solar PV Panels

Operator Real Wrap Co Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 16 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

St Andrews Industrial Estate, Third Way - Solar PV Panels is a 0.3 MW solar farm 6.1 km north-east of Portishead, Gloucestershire, United Kingdom. Its planning application (24/02009/RE) went to Bristol, City of on 23 May 2024 and was granted on 15 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 73 other energy sites within 10 km, 53 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for St Andrews Industrial Estate, Third Way - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 10 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels10 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol10 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol11 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Real Wrap Co Limited
Location
Real Wraps, St Andrews, St Andrews Industrial Estate, Units 13 - 16, Bristol, Gloucestershire, BS11 9TP, United Kingdom
Planning authority
Bristol, City of
Planning application
24/02009/RE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/02009/RE, with what the planning evidence pack adds for this site.

Every application in Bristol, City of · Alerts for applications and incidents near here

  • 23 May 2024 Planning application submitted
  • 15 July 2024 Planning permission granted

None found. The register holds no published incident that names St Andrews Industrial Estate, Third Way - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Has St Andrews Industrial Estate, Third Way - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names St Andrews Industrial Estate, Third Way - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of St Andrews Industrial Estate, Third Way - Solar PV Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 July 2024.
Where is St Andrews Industrial Estate, Third Way - Solar PV Panels?
6.1 km north-east of Portishead, Gloucestershire, United Kingdom (postcode BS11 9TP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).