← Back to Alberta

Solar · Canada

Spring Coulee Solar Project

Owner Evolugen

Operational42 MWData checked 8 October 2026Source record dated 19 June 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Spring Coulee Solar Project is a 42 MW solar farm 52 km south-west of Lethbridge, Cardston County, Alberta, Canada. It first operated in 2024. Its status in the Global Energy Monitor solar and wind trackers is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada, and 480 worldwide.

10 energy sites within 40 km for Spring Coulee Solar Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
42 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Operational (Operating)
Owner
Evolugen
Location
Cardston County, Alberta, Canada
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Spring Coulee Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Spring Coulee Solar Project had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Spring Coulee Solar Project; it holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada.
What is the status of Spring Coulee Solar Project?
Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 19 June 2024.
Where is Spring Coulee Solar Project?
52 km south-west of Lethbridge, Cardston County, Alberta, Canada.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).