Solar · United Kingdom
Southwick Estate
Operator Bluefield Solar Income Fund
Operational48 MWData checked 16 November 2026Source record dated 17 March 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Southwick Estate is a 48 MW solar farm on the edge of Denmead, Hampshire, United Kingdom. Its planning application (13/02304/FUL) went to Winchester on 16 October 2013 and was granted on 13 December 2013. It has been operating since 10 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 68 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Southwick Estate changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 48 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Bluefield Solar Income Fund
- Location
- Proposed Solar Park Southwick Estate, Belney Lane, Southwick, Hampshire, Hampshire, PO17 6ET, United Kingdom
- Planning authority
- Winchester
- Planning application
- 13/02304/FUL
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/02304/FUL, with what the planning evidence pack adds for this site.
Every application in Winchester · Alerts for applications and incidents near here
Timeline
- 16 October 2013 Planning application submitted
- 13 December 2013 Planning permission granted
- 10 December 2014 Construction started
- 10 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Southwick Estate. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Southwick Estate had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Southwick Estate; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Southwick Estate?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2015.
- Where is Southwick Estate?
- On the edge of Denmead, Hampshire, United Kingdom (postcode PO17 6ET).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).