Solar · United Kingdom
Southern Group Laboratory, Cavendish Courtyard - Solar Panels
Operator Southern Group Laboratory Limited
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 26 November 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Southern Group Laboratory, Cavendish Courtyard - Solar Panels is a 0.3 MW solar farm on the edge of Corby, Northamptonshire, United Kingdom. Its planning application (NC/24/00323/PASOLA) went to North Northamptonshire on 9 October 2024 and was granted on 12 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Southern Group Laboratory, Cavendish Courtyard - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Southern Group Laboratory, Cavendish Courtyard - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1545, Fire involving solar panels on a building under construction in Kettering, 13 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1545 | 2024 | Fire involving solar panels on a building under construction in Kettering | 13 km | Minor |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 20 km | Significant |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 23 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Southern Group Laboratory Limited
- Location
- Unit H Cavendish Courtyard Sallow Road, Northamptonshire, NN17 5DZ, United Kingdom
- Planning authority
- North Northamptonshire
- Planning application
- NC/24/00323/PASOLA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for NC/24/00323/PASOLA, with what the planning evidence pack adds for this site.
Every application in North Northamptonshire · Alerts for applications and incidents near here
Timeline
- 9 October 2024 Planning application submitted
- 12 November 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Southern Group Laboratory, Cavendish Courtyard - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Southern Group Laboratory, Cavendish Courtyard - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Southern Group Laboratory, Cavendish Courtyard - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Southern Group Laboratory, Cavendish Courtyard - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 November 2024.
- Where is Southern Group Laboratory, Cavendish Courtyard - Solar Panels?
- On the edge of Corby, Northamptonshire, United Kingdom (postcode NN17 5DZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).