Planning pack for this site, £295Other options

Solar · United Kingdom

Curver Way - Solar Panels

Operator Harvest Green Developments

Awaiting Construction1 MWData checked 16 November 2026Source record dated 5 November 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Curver Way - Solar Panels is a 1 MW solar farm on the edge of Corby, Northamptonshire, United Kingdom. Its planning application (NC/24/00299/PASOLA) went to North Northamptonshire on 19 September 2024 and was granted on 1 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

HARVEST GREEN DEVELOPMENTS LIMITED (11396369), active, since 2018. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Curver Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1545, Fire involving solar panels on a building under construction in Kettering, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15452024Fire involving solar panels on a building under construction in Kettering12 kmMinor
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property19 kmSignificant
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough22 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Harvest Green Developments
Location
Curver Way, Corby, Northamptonshire, NN17 5XN, United Kingdom
Planning authority
North Northamptonshire
Planning application
NC/24/00299/PASOLA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NC/24/00299/PASOLA, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 19 September 2024 Planning application submitted
  • 1 November 2024 Planning permission granted

None found. The register holds no published incident that names Curver Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Curver Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Curver Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Curver Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 November 2024.
Where is Curver Way - Solar Panels?
On the edge of Corby, Northamptonshire, United Kingdom (postcode NN17 5XN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).