Solar · United Kingdom
Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels
Operator Sibelco UK Preston Manor Works
Awaiting Construction0.8 MWData checked 16 November 2026Source record dated 10 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels is a 0.8 MW solar farm on the edge of Kingsteignton, Devon, United Kingdom. Its planning application (25/00070/NPA) went to Teignbridge on 15 January 2025 and was granted on 28 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1523, Fire damages solar panel batteries in a Teignmouth garage, 7.1 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1523 | 2026 | Fire damages solar panel batteries in a Teignmouth garage | 7.1 km | Minor |
| EIR-1536 | 2020 | Inverter fire at a solar farm at East Langford, Kilkhampton | 19 km | Minor |
| EIR-1535 | 2022 | Fire involves roof and solar panels at a house under construction in Dittisham | 21 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Sibelco UK Preston Manor Works
- Location
- Preston Manor Clay Works Kingsteignton, Devon, TQ12 3PR, United Kingdom
- Planning authority
- Teignbridge
- Planning application
- 25/00070/NPA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 25/00070/NPA, with what the planning evidence pack adds for this site.
Every application in Teignbridge · Alerts for applications and incidents near here
Timeline
- 15 January 2025 Planning application submitted
- 28 January 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2025.
- Where is Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels?
- On the edge of Kingsteignton, Devon, United Kingdom (postcode TQ12 3PR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).