← Back to Texas
Planning pack for this site, £295Other options

Solar · United States

SGT Hoskins Solar Project Hybrid

Operator SGT Hoskins Solar Project, LLC

Planned204 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

SGT Hoskins Solar Project Hybrid is a 204 MW solar farm 20 km east of Paris, Lamar County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 2 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for SGT Hoskins Solar Project Hybrid sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1271, Large fire reported at solar farm south of Blossom, 5.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12712022Large fire reported at solar farm south of Blossom5.6 kmSignificant
EIR-15002025Rooftop solar panels catch fire on a home in Franklin County49 kmMinor
EIR-17212024Grass fire at Kellam Solar Farm near Ben Wheeler136 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
204 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
SGT Hoskins Solar Project, LLC
Owner
SGT Hoskins Solar Project, LLC
Location
Lamar County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names SGT Hoskins Solar Project Hybrid. If you know of one, report it (confidential reports are anonymised).

Has SGT Hoskins Solar Project Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names SGT Hoskins Solar Project Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of SGT Hoskins Solar Project Hybrid?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is SGT Hoskins Solar Project Hybrid?
20 km east of Paris, Lamar County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).