← Back to Rajasthan
Planning pack for this site, £295Other options

Solar · India

SECI Tranche-IV (NLC) hybrid solar farm

Owner NLC India Ltd

Under construction87.5 MWData checked 8 October 2026Source record dated 12 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

SECI Tranche-IV (NLC) hybrid solar farm is a 87.5 MW solar farm 14 km west of Gotan, Rajasthan, India. Its status in the Global Energy Monitor solar and wind trackers is under construction. There are 28 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 22 incidents at solar farms (hybrid battery and solar sites included) in India, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for SECI Tranche-IV (NLC) hybrid solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 22 comparable solar incidents in India, nearest first. The nearest is EIR-2942, Storm damage reported at Bhadla solar park, Rajasthan, India, 161 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-29422026Storm damage reported at Bhadla solar park, Rajasthan, India161 kmMinor
EIR-25292026Fire of unknown cause at Grave solar plant in Dudu, Rajasthan162 kmMinor
EIR-20082026Fodder fire burns cables at a solar plant near Jhor village, Rajsamand171 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 19 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
87.5 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Under construction (Construction)
Owner
NLC India Ltd
Location
Rajasthan, India
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names SECI Tranche-IV (NLC) hybrid solar farm. If you know of one, report it (confidential reports are anonymised).

Has SECI Tranche-IV (NLC) hybrid solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names SECI Tranche-IV (NLC) hybrid solar farm; it holds 22 incidents at solar farms (hybrid battery and solar sites included) in India.
What is the status of SECI Tranche-IV (NLC) hybrid solar farm?
Under construction, in the Global Energy Monitor solar and wind trackers, where it last changed on 12 January 2026.
Where is SECI Tranche-IV (NLC) hybrid solar farm?
14 km west of Gotan, Rajasthan, India.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).