Offshore wind · United Kingdom
Seagreen Phase 1A
Operator SSE & Seagreen Wind Energy Ltd
Awaiting Construction540 MWData checked 16 November 2026Source record dated 3 July 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Seagreen Phase 1A is a 540 MW offshore wind farm 34 km east of Montrose, United Kingdom. Its planning application went to Marine Scotland on 14 September 2018 and was granted on 6 December 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Seagreen Phase 1A changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Seagreen Phase 1A sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2700, Repeat Vestas turbine failures hit pioneering floating wind project in Scotland, 135 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2700 | 2026 | Repeat Vestas turbine failures hit pioneering floating wind project in Scotland | 135 km | Significant |
| EIR-0029 | 2024 | Second blade failure of 2024 at Dogger Bank A offshore wind farm | 192 km | Significant |
| EIR-0758 | 2024 | Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm | 192 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Offshore wind
- Capacity
- 540 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- SSE & Seagreen Wind Energy Ltd
- Location
- Firth of Forth Wind Zone 2, Dundee, Tayside, Offshore, DD4 0AD, United Kingdom
- Planning authority
- Marine Scotland
- Turbines
- 36
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Marine Scotland · Alerts for applications and incidents near here
Timeline
- 14 September 2018 Planning application submitted
- 6 December 2019 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Seagreen Phase 1A. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Seagreen Phase 1A had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Seagreen Phase 1A; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Seagreen Phase 1A?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2023.
- Where is Seagreen Phase 1A?
- 34 km east of Montrose, United Kingdom (postcode DD4 0AD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).