Solar · United Kingdom
Sanko Gosei Solar Panels
Operator Sanko Gosei UK Limited
Operational0.5 MWData checked 16 November 2026Source record dated 15 September 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sanko Gosei Solar Panels is a 0.5 MW solar farm on the edge of Skelmersdale, Lancashire, United Kingdom. Its planning application (20/1089/PNR) went to West Lancashire on 16 December 2020 and was granted on 4 February 2021. It has been operating since 10 October 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Sanko Gosei Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Sanko Gosei UK Limited
- Location
- Sanko Gosei, 15 - 17 Seddon Place Stanley Industrial Estate, Skelmersdale, Lancashire, WN8 8EB, United Kingdom
- Planning authority
- West Lancashire
- Planning application
- 20/1089/PNR
- First operating
- 2021
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/1089/PNR, with what the planning evidence pack adds for this site.
Every application in West Lancashire · Alerts for applications and incidents near here
Timeline
- 16 December 2020 Planning application submitted
- 4 February 2021 Planning permission granted
- 10 October 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Sanko Gosei Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Sanko Gosei Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sanko Gosei Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Sanko Gosei Solar Panels?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 September 2022.
- Where is Sanko Gosei Solar Panels?
- On the edge of Skelmersdale, Lancashire, United Kingdom (postcode WN8 8EB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).