Solar · United Kingdom
Sandy Road - Solar Panels & Biomass Boiler
Operator CEM Day Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 24 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sandy Road - Solar Panels & Biomass Boiler is a 0.2 MW solar farm on the edge of Llanelli, Dyfed, United Kingdom. Its planning application (PL/05424) went to Carmarthenshire on 2 March 2023 and was granted on 3 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Sandy Road - Solar Panels & Biomass Boiler changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sandy Road - Solar Panels & Biomass Boiler sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 97 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 97 km | Minor |
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 110 km | Significant |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 114 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- CEM Day Limited
- Location
- Former C E M Day Limited, Sandy Road, Llanelli, Dyfed, SA15 4DP, United Kingdom
- Planning authority
- Carmarthenshire
- Planning application
- PL/05424
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PL/05424, with what the planning evidence pack adds for this site.
Every application in Carmarthenshire · Alerts for applications and incidents near here
Timeline
- 2 March 2023 Planning application submitted
- 3 March 2025 Planning permission granted
- 3 March 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Sandy Road - Solar Panels & Biomass Boiler. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Sandy Road - Solar Panels & Biomass Boiler had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sandy Road - Solar Panels & Biomass Boiler; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Sandy Road - Solar Panels & Biomass Boiler?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 March 2025.
- Where is Sandy Road - Solar Panels & Biomass Boiler?
- On the edge of Llanelli, Dyfed, United Kingdom (postcode SA15 4DP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).