Onshore wind · United Kingdom
Rogers Hill Farm -Wind Turbine Repowering
Operator Distributed Generation Limited
Awaiting Construction2 MWData checked 16 November 2026Source record dated 21 July 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rogers Hill Farm -Wind Turbine Repowering is a 2 MW wind farm 13 km north-west of Wareham, Dorset, United Kingdom. Its planning application (P/FUL/2025/01365) went to Dorset on 20 March 2025 and was granted on 13 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Rogers Hill Farm -Wind Turbine Repowering changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rogers Hill Farm -Wind Turbine Repowering sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 126 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0794 | 2022 | Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch | 126 km | Significant |
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 186 km | Significant |
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 199 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Distributed Generation Limited
- Location
- Rogers Hill Farm, Rogers Hill, Briantspuddle, Dorchester, Dorset, DT2 7HJ, United Kingdom
- Planning authority
- Dorset
- Planning application
- P/FUL/2025/01365
- Turbines
- 1, 125 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/FUL/2025/01365, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Status changed from Application Submitted to Awaiting Construction on 16 November 2026.
Timeline
- 20 March 2025 Planning application submitted
- 13 July 2026 Planning permission granted
- 13 July 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Rogers Hill Farm -Wind Turbine Repowering. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Rogers Hill Farm -Wind Turbine Repowering had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rogers Hill Farm -Wind Turbine Repowering; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Rogers Hill Farm -Wind Turbine Repowering?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Rogers Hill Farm -Wind Turbine Repowering?
- 13 km north-west of Wareham, Dorset, United Kingdom (postcode DT2 7HJ).