← Back to Arizona

Energy sites / United States / Arizona

Battery storage · United States

Roadrunner Reserve Phase 2

Operational200 MWChecked 6 October 2026

Technology
Battery storage (800 MWh)
Capacity
200 MW
Status
Operational
Operator
Tucson Electric Power Co
Location
Pima County, Arizona, United States
First operating
2026
Balancing authority
TEPC

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Roadrunner Reserve Phase 2. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at battery storage sites in the United States, 43 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.