Roadrunner Reserve Phase 1

Operator Tucson Electric Power Co

Operational200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Roadrunner Reserve Phase 1 is a 200 MW battery storage site 10 km west of Vail, Pima County, Arizona, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 15 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 8 other sites and 37 energy sites within 40 km for Roadrunner Reserve Phase 1

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (800 MWh)
Capacity
200 MW (this record)
All phases
400 MW, the phases on the register added up
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Tucson Electric Power Co
Owner
Tucson Electric Power Co
Location
Pima County, Arizona, United States
First operating
2025
Balancing authority
TEPC

This record is 200 MW, one part of a site built in phases. With Roadrunner Reserve Phase 2 (200 MW) the phases on the register add up to 400 MW. Roadrunner Reserve Phase 2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Roadrunner Reserve Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Roadrunner Reserve Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Roadrunner Reserve Phase 1; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Roadrunner Reserve Phase 1?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Roadrunner Reserve Phase 1?
10 km west of Vail, Pima County, Arizona, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).