Solar · United Kingdom
Riverside Energy Park (REP)
Operator Cory Riverside Energy
Awaiting Construction1 MWData checked 16 November 2026Source record dated 30 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Riverside Energy Park (REP) is a 1 MW solar farm on the edge of Thamesmead, London, United Kingdom. Its planning application (EN010093) went to The Planning Inspectorate - National Infrastructure on 16 November 2018 and was granted on 9 April 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 113 other energy sites within 10 km, 76 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Riverside Energy Park (REP) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Riverside Energy Park (REP) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 12 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1173 | 2024 | Rooftop solar panel fire on residential block in Lewisham, London | 12 km | Significant |
| EIR-1305 | 2017 | Fire at Thornton Heath flats reported to have been caused by an overheated solar panel | 21 km | Significant |
| EIR-1514 | 2024 | Garage fire destroys solar panels in Southgate, with a battery storage fault suspected | 24 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Cory Riverside Energy
- Location
- Norman Road, Bexley, London, DA17 6JY, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010093
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010093, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 16 November 2018 Planning application submitted
- 9 April 2020 Planning permission granted
- 9 April 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Riverside Energy Park (REP). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Riverside Energy Park (REP) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Riverside Energy Park (REP); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Riverside Energy Park (REP)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2020.
- Where is Riverside Energy Park (REP)?
- On the edge of Thamesmead, London, United Kingdom (postcode DA17 6JY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).