Solar · United Kingdom

Ceme Campus, Marsh Way - Solar PV Panels

Operator Private Developer

Awaiting Construction0.9 MWData checked 16 November 2026Source record dated 2 May 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ceme Campus, Marsh Way - Solar PV Panels is a 0.9 MW solar farm on the edge of Rainham, London, United Kingdom. Its planning application (P0037.23) went to Havering on 1 February 2023 and was granted on 28 April 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 115 other energy sites within 10 km, 74 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ceme Campus, Marsh Way - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London14 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel23 kmSignificant
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected24 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
CEME Campus, Marsh Way, Rainham, London, RM13 8EU, United Kingdom
Planning authority
Havering
Planning application
P0037.23

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P0037.23, with what the planning evidence pack adds for this site.

Every application in Havering · Alerts for applications and incidents near here

  • 1 February 2023 Planning application submitted
  • 28 April 2023 Planning permission granted

None found. The register holds no published incident that names Ceme Campus, Marsh Way - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Has Ceme Campus, Marsh Way - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ceme Campus, Marsh Way - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ceme Campus, Marsh Way - Solar PV Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 May 2023.
Where is Ceme Campus, Marsh Way - Solar PV Panels?
On the edge of Rainham, London, United Kingdom (postcode RM13 8EU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).