Solar · United Kingdom
Rivendell Nurseries - Solar Panels
Operator Rivendell Nurseries Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 10 August 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rivendell Nurseries - Solar Panels is a 0.2 MW solar farm 3.2 km north-east of Widnes, Cheshire, United Kingdom. Its planning application (26/00221/PRIOR) went to Halton on 9 June 2026 and was granted on 4 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 82 other energy sites within 10 km, 60 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Rivendell Nurseries - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rivendell Nurseries - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 18 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 18 km | Significant |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 51 km | Minor |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 55 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Rivendell Nurseries Limited
- Location
- Rivendell Nurseries Ltd Mill Lane, Cheshire, WA8 3UL, United Kingdom
- Planning authority
- Halton
- Planning application
- 26/00221/PRIOR
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 26/00221/PRIOR, with what the planning evidence pack adds for this site.
Every application in Halton · Alerts for applications and incidents near here
Status changed from Application Submitted to Awaiting Construction on 16 November 2026.
Timeline
- 9 June 2026 Planning application submitted
- 4 August 2026 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Rivendell Nurseries - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Rivendell Nurseries - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rivendell Nurseries - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Rivendell Nurseries - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Rivendell Nurseries - Solar Panels?
- 3.2 km north-east of Widnes, Cheshire, United Kingdom (postcode WA8 3UL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).