Fiddlers Ferry Power Station - Battery storage

Operator SSE Enterprise (SSE PLC) · Owner Sse Renewables Solar & Battery Holdings Limited

Under Construction150 MWData checked 16 November 2026Source record dated 21 March 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Fiddlers Ferry Power Station - Battery storage is a 150 MW battery storage site 3.3 km east of Widnes, Cheshire, United Kingdom. Its planning application (2022/41800) went to Warrington on 27 July 2022 and was granted on 20 June 2023. Construction started on 28 March 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 78 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fiddlers Ferry Power Station - Battery storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool15 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells108 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire191 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
150 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
SSE Enterprise (SSE PLC)
Owner
Sse Renewables Solar & Battery Holdings Limited
Location
Fiddlers Ferry Power Station, Widnes Road, Warrington, Cheshire, WA5 2UT, United Kingdom
Planning authority
Warrington
Planning application
2022/41800

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2022/41800, with what the planning evidence pack adds for this site.

Every application in Warrington · Alerts for applications and incidents near here

  • 27 July 2022 Planning application submitted
  • 20 June 2023 Planning permission granted
  • 28 March 2024 Construction started

None found. The register holds no published incident that names Fiddlers Ferry Power Station - Battery storage. If you know of one, report it (confidential reports are anonymised).

Has Fiddlers Ferry Power Station - Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fiddlers Ferry Power Station - Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fiddlers Ferry Power Station - Battery storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 March 2024.
Where is Fiddlers Ferry Power Station - Battery storage?
3.3 km east of Widnes, Cheshire, United Kingdom (postcode WA5 2UT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).