← Back to Arizona
Planning pack for this site, £295Other options

Solar · United States

Red Antelope Solar & Energy Storage Farm

Operator 302PN 8me LLC

Planned400 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Red Antelope Solar & Energy Storage Farm is a 400 MW solar farm 29 km south-east of Page, Coconino County, Arizona, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Red Antelope Solar & Energy Storage Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0679, Battery storage failure reported at solar integration site in Flagstaff, Arizona, 170 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06792012Battery storage failure reported at solar integration site in Flagstaff, Arizona170 kmSignificant
EIR-27772025Multiple agencies respond to battery storage fire in Arizona251 kmSignificant
EIR-01012025Battery units ignite at Townsite Solar and Storage in Boulder City, Nevada328 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
400 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
302PN 8me LLC
Owner
302PN 8me LLC
Location
Coconino County, Arizona, United States
Expected
2028
Balancing authority
AZPS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Red Antelope Solar & Energy Storage Farm. If you know of one, report it (confidential reports are anonymised).

Has Red Antelope Solar & Energy Storage Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Red Antelope Solar & Energy Storage Farm; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Red Antelope Solar & Energy Storage Farm?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Red Antelope Solar & Energy Storage Farm?
29 km south-east of Page, Coconino County, Arizona, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).