← Back to Colorado

Solar · United States

Rawhide Prairie Solar Hybrid

Operator Greenbacker Renewable Energy Corporation

Operational22 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rawhide Prairie Solar Hybrid is a 22 MW solar farm 17 km north of Wellington, Larimer County, Colorado, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 3 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 135 other sites and 40 energy sites within 40 km for Rawhide Prairie Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
22 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Greenbacker Renewable Energy Corporation
Owner
Greenbacker Renewable Energy Corporation
Location
Larimer County, Colorado, United States
First operating
2021
Balancing authority
PSCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Rawhide Prairie Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Rawhide Prairie Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rawhide Prairie Solar Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Rawhide Prairie Solar Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Rawhide Prairie Solar Hybrid?
17 km north of Wellington, Larimer County, Colorado, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).