Around this site

← Back to Qinghai

Solar · China

Qinghai Hainan Clean Energy Transmission Base solar farm

Under construction9600 MWChecked 8 October 2026Last changed in the dataset 1 December 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Qinghai Hainan Clean Energy Transmission Base solar farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
9600 MW
Status
Under construction (Construction)
Owner
State Power Investment Group Yellow River Upstream Hydropower Development Co Ltd; Guangdong Energy Group Co Ltd
Location
Hainan AP, Qinghai, China
First operating
2028

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Qinghai Hainan Clean Energy Transmission Base solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.