← Back to Centre-Val de Loire

Energy sites / France / Centre-Val de Loire

Solar · France

PVs41-0031 LIGNIERES

Operational3.9 MWChecked 6 October 2026

Technology
Solar
Capacity
3.9 MW
Status
Operational (En service)
Location
Lignières, Loir-et-Cher, Centre-Val de Loire, France
First operating
2025
Network operator
Enedis

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

  • 1 October 2025 Connected to the grid
  • 1 October 2025 Operational

None found. The register holds no published incident that names PVs41-0031 LIGNIERES. If you know of one, report it (confidential reports are anonymised).

The register holds 3 incidents at solar farms in France, 3 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts.