Solar · France

Confidentiel

Operational8.3 MWChecked 19 October 2026

Confidentiel is a 8.3 MW solar farm 18 km north-west of Vendôme, Beauchêne, Loir-et-Cher, Centre-Val de Loire, France. It first operated in 2026. Its status in the Registre national des installations (ODRE, France) is operational. There are 4 other energy sites within 10 km, 3 of them solar farms. The register holds no incident at this site. It holds 5 incidents at solar farms in France, and 390 worldwide.

26 energy sites within 40 km for Confidentiel

The sites and incidents around this one, and every record behind them, open with any of these.

Analyst, £39 a month

Ask the register any question in plain words and get a sourced answer in seconds (20 a month), plus the full record behind every entry. Cancel at any time. Limited-time price, rising to £79. Join now and keep £39.

Once per person; every record, every page, for reading, and 1 free question to Ask the register; no subscription

Your company pays: an invoice to download and forward, paid by card or bank transfer within 30 days

Technology
Solar
Capacity
8.3 MW
Status
Operational (En service)
Location
Beauchêne, Loir-et-Cher, Centre-Val de Loire, France
First operating
2026
Network operator
Enedis

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 4 August 2026 Connected to the grid
  • 4 August 2026 Operational

None found. The register holds no published incident that names Confidentiel. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Confidentiel had a fire or other incident?
None is on the register as of 29 October 2026. The register holds no published incident that names Confidentiel; it holds 5 incidents at solar farms in France.
What is the status of Confidentiel?
Operational, in the Registre national des installations (ODRE, France).
Where is Confidentiel?
18 km north-west of Vendôme, Beauchêne, Loir-et-Cher, Centre-Val de Loire, France.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).