← Back to Brandenburg

Solar · Germany

PVA Haidemühl

Operator Solarpark HR I GmbH

Operational18.8 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PVA Haidemühl is a 18.8 MW solar farm Spree-Neiße, Brandenburg, Germany. It first operated in 2024. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. The register holds no incident at this site. It holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany, and 480 worldwide.

Everything on this page

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
18.8 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
Solarpark HR I GmbH
Location
Spree-Neiße, Brandenburg, Germany
First operating
2024

  • 20 November 2024 Operational

None found. The register holds no published incident that names PVA Haidemühl. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has PVA Haidemühl had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names PVA Haidemühl; it holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany.
What is the status of PVA Haidemühl?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is PVA Haidemühl?
Spree-Neiße, Brandenburg, Germany.

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts.