Solar · Germany
PVA Dürrenhofe
Operator nawes Invest GmbH & Co. KG
Operational1.7 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
PVA Dürrenhofe is a 1.7 MW solar farm 10 km north of Lubin, Märkische Heide, Dahme-Spreewald, Brandenburg, Germany. It first operated in 2023. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 12 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.
Get an email when PVA Dürrenhofe changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.7 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Operational (In operation)
- Operator
- nawes Invest GmbH & Co. KG
- Location
- Märkische Heide, Dahme-Spreewald, Brandenburg, 15913, Germany
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 22 December 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names PVA Dürrenhofe. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has PVA Dürrenhofe had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names PVA Dürrenhofe; it holds 6 incidents at solar farms in Germany.
- What is the status of PVA Dürrenhofe?
- Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is PVA Dürrenhofe?
- 10 km north of Lubin, Märkische Heide, Dahme-Spreewald, Brandenburg, Germany (postcode 15913).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).