Solar · Germany
PV01a und PV02_Halle 2-8_1399,68kW
Operator sedak GmbH & Co. KG
Operational1.2 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
PV01a und PV02_Halle 2-8_1399,68kW is a 1.2 MW solar farm on the edge of Gersthofen, Germany. It first operated in 2022. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 26 other energy sites within 10 km, 20 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.
Get an email when PV01a und PV02_Halle 2-8_1399,68kW changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.2 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Operational (In operation)
- Operator
- sedak GmbH & Co. KG
- Location
- Gersthofen, Augsburg, Bayern, 86368, Germany
- First operating
- 2022
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 23 November 2022 Operational
Incidents on the register at this site
None found. The register holds no published incident that names PV01a und PV02_Halle 2-8_1399,68kW. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has PV01a und PV02_Halle 2-8_1399,68kW had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names PV01a und PV02_Halle 2-8_1399,68kW; it holds 6 incidents at solar farms in Germany.
- What is the status of PV01a und PV02_Halle 2-8_1399,68kW?
- Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is PV01a und PV02_Halle 2-8_1399,68kW?
- On the edge of Gersthofen, Germany (postcode 86368).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).