← Back to Bayern

Solar · Germany

PV Anlage 2025 Anlagenteil 2 Ausschreibung

Operator Naturstrom Fuchsau GmbH & Co. KG

Operational5.4 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PV Anlage 2025 Anlagenteil 2 Ausschreibung is a 5.4 MW solar farm 13 km north-west of Neustadt an der Aisch, Markt Bibart, Neustadt a.d. Aisch-Bad Windsheim, Bayern, Germany. It first operated in 2025. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 24 other energy sites within 10 km, 15 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.

The operator's 2 other sites and 405 energy sites within 40 km for PV Anlage 2025 Anlagenteil 2 Ausschreibung

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5.4 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
Naturstrom Fuchsau GmbH & Co. KG
Location
Markt Bibart, Neustadt a.d. Aisch-Bad Windsheim, Bayern, 91477, Germany
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 5 September 2025 Operational

None found. The register holds no published incident that names PV Anlage 2025 Anlagenteil 2 Ausschreibung. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has PV Anlage 2025 Anlagenteil 2 Ausschreibung had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names PV Anlage 2025 Anlagenteil 2 Ausschreibung; it holds 6 incidents at solar farms in Germany.
What is the status of PV Anlage 2025 Anlagenteil 2 Ausschreibung?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is PV Anlage 2025 Anlagenteil 2 Ausschreibung?
13 km north-west of Neustadt an der Aisch, Markt Bibart, Neustadt a.d. Aisch-Bad Windsheim, Bayern, Germany (postcode 91477).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).