Around this site

← Back to Telangana

Solar · India

Project Rudra solar farm

Operational17.8 MWChecked 8 October 2026Last changed in the dataset 5 August 2025

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

Technology
Solar
Capacity
17.8 MW
Status
Operational (Operating)
Operator
AMP Energy India
Owner
AMP Energy India [100%]
Location
Telangana, India
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.