Solar · United Kingdom
Priest Weston
Operator Mellington Farm
Operational1 MWData checked 16 November 2026Source record dated 24 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Priest Weston is a 1 MW solar farm 12 km south-east of Welshpool, Shropshire, United Kingdom. Its planning application (14/01815/FUL) went to Shropshire on 22 April 2014 and was granted on 18 July 2014. It has been operating since 10 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Priest Weston changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Mellington Farm
- Location
- Priest Weston, Montgomery, Powys, Shropshire, SY15 6DE, United Kingdom
- Planning authority
- Shropshire
- Planning application
- 14/01815/FUL
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/01815/FUL, with what the planning evidence pack adds for this site.
Every application in Shropshire · Alerts for applications and incidents near here
Timeline
- 22 April 2014 Planning application submitted
- 18 July 2014 Planning permission granted
- 10 December 2014 Construction started
- 10 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Priest Weston. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Priest Weston had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Priest Weston; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Priest Weston?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 May 2016.
- Where is Priest Weston?
- 12 km south-east of Welshpool, Shropshire, United Kingdom (postcode SY15 6DE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).