Priest Weston

Operator Mellington Farm

Operational1 MWData checked 16 November 2026Source record dated 24 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Priest Weston is a 1 MW solar farm 12 km south-east of Welshpool, Shropshire, United Kingdom. Its planning application (14/01815/FUL) went to Shropshire on 22 April 2014 and was granted on 18 July 2014. It has been operating since 10 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

142 energy sites within 40 km for Priest Weston

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Mellington Farm
Location
Priest Weston, Montgomery, Powys, Shropshire, SY15 6DE, United Kingdom
Planning authority
Shropshire
Planning application
14/01815/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01815/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 22 April 2014 Planning application submitted
  • 18 July 2014 Planning permission granted
  • 10 December 2014 Construction started
  • 10 March 2015 Operational

None found. The register holds no published incident that names Priest Weston. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Priest Weston had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Priest Weston; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Priest Weston?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 May 2016.
Where is Priest Weston?
12 km south-east of Welshpool, Shropshire, United Kingdom (postcode SY15 6DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).