Solar · Brazil

PRD I

Owner PERFILADOS RIO DOCE LTDA

Operational2 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PRD I is a 2 MW solar farm Serra, Espírito Santo, Brazil. It first operated in 2025. Its status in the SIGA generation register (ANEEL, Brazil) is operational. The register holds no incident at this site. It holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil, and 480 worldwide.

Everything on this page

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2 MW
Capacity figure from
SIGA generation register (ANEEL, Brazil)
Status
Operational (Operação)
Owner
PERFILADOS RIO DOCE LTDA
Location
Serra, Espírito Santo, Brazil
First operating
2025

  • 10 September 2025 Operational

None found. The register holds no published incident that names PRD I. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has PRD I had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names PRD I; it holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil.
What is the status of PRD I?
Operational, in the SIGA generation register (ANEEL, Brazil).
Where is PRD I?
Serra, Espírito Santo, Brazil.

Source: ANEEL, Sistema de Informacoes de Geracao (SIGA), Open Data Commons Open Database Licence (ODbL), dadosabertos.aneel.gov.br. The dataset. The register adds only the incidents and the counts.